IFC P00003 — V3 Design (3x 3-way + waste valves)

← Home V1 V2 Changes
Buffer inlet Waste outlet Pump syringe 3-way Sample/Wash spot Air intake V8 NO IN NC V7 B A V4 V3 V5 V6 V2 NC IN NO V1 NC IN NO

Presets

Design Notes

Buffer → D: No isolated path to D. V1+V2+V3+V5 also opens B/C flow path.
Sample → D: No isolated path to D. V2+V3+V5 also opens B/C flow path.
Buffer/Sample → BC simultaneous: B/C share a junction and U-path connection. Unequal flow distribution likely. Sequential B then C operation recommended.
Pullback mapping (sample front-end divert):
Sample A → Pullback line
Sample B → Sample bypass
Sample C → Sample bypass
Sample AB → Pullback line
Sample BC → Sample bypass
Sample ABC → Pullback line
Sample ABCD → Pullback line